Cleanroom Construction

Cleanroom Fan Filter Units vs Air Handling Units

A cleanroom air handling unit (AHU) is a cornerstone of temperature, humidity, and pressurization within controlled environments. Today, modular fan filter units allow more adaptable configuration with simplified maintenance procedure. Both systems serve conditioned and filtered air throughout a cleanroom facility. 

Read More »

Satellite Cleanrooms – Design, Garments, and Contamination

For communication satellites that remain within earth’s orbit, an ISO Class 6-8 cleanroom allows sufficient particle and contaminant control. Cleanroom engineers design each space so that particles from production surfaces are whisked away from critical components. A combination of softwall production areas and hardwall cleanroom facilities provide isolation of critical tasks.

Read More »
USP 800 cleanroom upgrades - ISO 5 with ISO 7 Buffer room

Upgrading a USP 797 Cleanroom to USP 800?

New USP guidelines may present challenges for compounding facilities. Some facilities need infrastructural and mechanical modifications for compliance. System evaluation includes duct systems, HEPA fan filters, differential pressure standards, air monitoring, and external air exhaust equipment.

Read More »

Cleanroom Construction FAQ

Definitive Cleanroom Construction FAQ: How much does a cleanroom cost? How does the level of ISO classification impact build and operating costs? How much supporting space will I need for a cleanroom addition or ISO class upgrade? What’s the advantage of a turnkey cleanroom system?

Read More »

Turnkey Cleanroom Install

CleanPro’s turn-key cleanroom solution provided a one-stop, one-contact result for the initial delivery and on-site installation of walls, ceiling grids, electrical systems, flooring, filters, HVAC, and more.

Read More »

Softwall Cleanroom Curtains Project

Softwall cleanroom curtains, sometimes referred simply as “plastic strips” yield ISO Class 10,000 level particle control with minimal construction. This customer required a custom softwall installation that integrated into their existing building structure CleanPro to deliver a softwall cleanroom

Read More »

Clean-Forward Lab Furniture Project

Industrial workbenches and workstations provide integrated design features such as power bars, application specific surface materials, and custom drawer and cabinet configurations for safe, organized storage. This laboratory enlisted for a complete laboratory outfit, with ergonomic seating and Lista drawer cabinet workstations.

Read More »

Chemotherapy and CSP Cleanroom Installation

This modular, sterile compounding cleanroom is designed for ISO 797 and ISO 800 compliance, particularly for compounding chemotherapy drugs. Safe handling of sterile compounds requires special considerations: heat-welded floors, anterooms and buffer areas.

Read More »
Sign Up to Our Newsletter

Categories
Search Posts
PAC on Twitter
Follow me on Twitter
function defer_parsing_of_js ( $url ) { if ( FALSE === strpos( $url, ‘.js’ ) ) return $url; if ( strpos( $url, ‘jquery.js’ ) ) return $url; return “$url’ defer “; } add_filter( ‘clean_url’, ‘defer_parsing_of_js’, 11, 1 );